High water table for concrete footings

Get answers from ICF Pros. Before posting, search existing posts for keywords (use search box at top of screen).

High water table for concrete footings

New postby mpv41 » Mon May 12, 2003 8:51 pm

I am building a garage addition and the water table is very high. When I dig the hole for the footings how do I keep the water out of the hole until the footings and foundation walls are built?
mpv41
 

New postby Eggert Construction » Tue May 13, 2003 1:36 pm

A small sump pump many times works.

Keep in mind that the building inspector does not want to see standing water in order to approve the excavation for the footing.
Take Care
Jim

Design-Build Services
"Not So Big" Design Proponent
Eggert Construction
ICF Professional
 
Posts: 448
Joined: Wed Oct 23, 2002 8:31 am
Location: Branford, CT